|
|
|
|
|
|
KINGSTON
LACY HOUSE
National Trust |
|
|
|
|
|
|
|
|
|
|
|
Bringing
new stone onto site |
<< |
>> |
|
|
|
|
|
|
|
|
|
Extent of works
- To lift the existing south terrace stone flags individually;
including the seats at the apsidal ends and the removal
of bituminous material. Lifting equipment includes
a gantry, vacuum lifting equipment and ‘Kevlar’
lifting bags
- Repair to the substructure and fitting of a new ‘kaltek’
waterproof membrane
- Reinstallation of stones to their original position.
Each slab levelled using pneumatic lifting bags following
which, pressure grouted bags hold the slabs permanently
in position
|
|
|
|